top of page

MAY/SEPTEMBER
Rob Ley
Parking garage facade.
Eskenazi Hospital
Indianapolis, Indiana, USA
Eskenazi Health Department of Civic Engagement
Aluminum, stainless steel, industrial urethane.
55 ft x 265 ft x 4 ft
Installed 2014
May/September is a parking garage screen wall designed by Rob Ley for Eskenazi Hospital in Indianapolis. The artwork challenges the notion of the parking garage as a mundane, purely functional structure, and transforms the wall into a dynamic facade of 7,000 metal panels that produce shifts in color and light as the vantage point of the viewer changes.
IA Scope:
Project Management
Design Development
Fabrication
Custom Aluminum Extrusion
Coating
Pre-Assembly
Installation
Contributors:
Nous Engineering
Northern States Metals








bottom of page